Monday, May 16, 2011
Uneven progress
At the weekend, things seemed to be going slowly until I made several breakthroughs; the first was the decision add a base and then to increase the height of the base to allow the crossover to be mounted under the cabinet but not inside. That meant I could finish the wiring and not have to wire the binding post thought the inside of the cab. Aside from the last set of connectors the wiring is now finished. I also decided to glue the baffle in place which mean the mid cab had to be braced and filled from the top; which it was, and the top is now on and glued and the whole things trimmed and planed into shape. Filler was applied to the exposed pieces of particle board and the first unit is ready for sanding and painting. When I get the additional wood needed for the base I'll be able to complete that at which point the unit will be reading for measurement and testing. I'm waiting for the binding posts and terminals but, Fedx permitting, next weekend, I will be mounting the drivers.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment